: Verify the integrity of the RS-232, RS-485, or Ethernet cabling connecting the PC control console to the generator control rack.
Primary beam walls must have at least 35cm thick brick (or equivalent), while scatter walls require 23cm. Lead shielding (1.75mm) is necessary for doors and windows. drgem x ray service manual install
Connect the high-voltage (HV) cables, rotor cables, and ground (earth) cables. Route cables for the X-ray up/down switches and sensors. : Verify the integrity of the RS-232, RS-485,
Fixed systems like the GXR-SD typically require a minimum room height of 2.8m to 3.0m for full tube stand travel. drgem x ray service manual install
Do not attempt a service manual install without proper authorization from your hospital’s radiation safety officer and your service contract terms. Incorrect installation can lead to exposure errors or DICOM data loss.